Quality
Testing follows the guideline
A test is only as useful as the requirement it was written against.

Yassun Technologies tests to the customer’s requirements and test guidelines. That is the scope. A general assurance of “full test” is not a substitute for the document that says what must be demonstrated.
The guideline should travel with the enquiry, next to the Gerber data and, where relevant, the bill of materials. Inspection of workmanship and a functional test are different checks. The order should say which of them is required.
If a test cannot be performed within the confirmed scope, that limit is stated. It is not filled in with an unstated procedure or an unstated certificate.
The same rule holds for prototype, pilot, and production. A prototype can be tested to a short guideline. A production lot should not silently inherit a wider test than the one that was agreed.
Customers in aerospace, defence, oil and gas, industrial, railways, medical, robotics, and automation each bring their own guideline. The build follows that guideline. It does not invent one.
Discuss a requirement